Parts Programme — Mining Equipment

Mining Machinery Parts: Beyond the Crusher, Across the Plant

Crushers are the core of our catalogue, but a mine's parts list does not stop at the crushing plant. Our mining machinery parts programme extends the same supply discipline — part number, confirmed fit, honest lead time — across screening equipment and the wider mining machine range.

Request a QuotationBrowse Spare Parts

01Equipment imagery
02Crushers + screens
03Shovel/excavator scope
04One fit process
Luckcome company banner: engineer wearing a Luckcome hard hat
Company equipment banner imagery from the official site.

Scope of the programme

The company's product scope covers crusher parts, crushers, mining machines, and shovel, excavator and screen parts — the equipment families a hard-rock operation runs from the face to the stockpile. Within that scope, the deepest catalogue coverage sits where the company's manufacturing sits: crushing and screening. Cone and jaw crusher wear parts, gyratory components, vibrating screen equipment and spares, and the mechanical internals catalogued under crusher spare parts are the stocked heart of the programme. Shovel and excavator parts enquiries are handled against the same identification process — part number or drawing first, quotation second.

Why mines consolidate parts supply

A mine's maintenance planner fights a numbers problem: thousands of part lines, dozens of original suppliers, and a shutdown calendar that forgives nothing. Consolidating the crushing and screening scope with one manufacturer-supplier cuts that problem down — one fit-confirmation standard, combined shipments, and a supplier whose engineers know how the machines interact. When the cone crusher's circulating load rises, the cause may sit at the screen; a parts partner who supplies both sides of that circuit diagnoses faster than two vendors pointing at each other.

Services around the parts

The parts programme sits inside the company's broader service offer: technical consultation, system design, installation, commissioning, maintenance and operator training across the equipment range, plus crusher repair work on assemblies such as heads, release cylinders, shaft assemblies and frames. For a mine building a parts strategy — critical-spares listing, shutdown kitting, wear-life tracking by chamber — that service layer is the difference between a parts vendor and a parts programme.

Terms

Minimum order (1 piece on most catalogue lines) and lead time are confirmed per quotation, typically within 15 workdays in peak season for common parts and around one month in the off-season; shipment on FOB, EXW, CIF or FCA terms; payment by T/T or L/C. Certificates available upon request. Start with your equipment list — crushers, screens and the mining machines you run — and we will return a coverage map showing which of your parts the programme stocks, which it makes to order, and which it honestly does not cover.

ScopeCrusher parts, screen parts, mining machine components
Deepest coverageCrushing & screening equipment
ServicesConsultation, design, installation, repair, training
Minimum order1 piece on most lines, confirmed with your quotation

From parts list to parts strategy

The difference between a parts list and a parts strategy is one question: what does each missing part cost per day? A mine that answers it honestly sorts its catalogue into three tiers. Tier one — plant-stopping, long-lead: the crusher wear sets, main shafts, and assemblies whose absence idles the operation; these are stocked or covered by agreed supply. Tier two — plant-stopping, short-lead: seals, bushings, hardware; stocked cheaply because the minimum order is one piece, confirmed with your quotation. Tier three — everything else: ordered on demand against confirmed lead times. Our programme is structured to serve all three tiers from one identification standard, and the coverage-mapping conversation — equipment list in, tiered coverage position out — is offered before any order exists. Mines that run this discipline stop measuring their parts supplier by price per piece and start measuring by shutdowns that happened on schedule. That is the measurement we prefer to be judged by.

Send us your part number or drawing

Quotes are prepared against your model, part number or dimension drawing. Minimum order is 1 piece on most catalogue parts — like the current lead time, it is confirmed with your quotation (typically within 15 workdays in peak season and about one month in the off-season). Contact Angela Ren of the Import & Export Department at the company sales email [email protected] or by mobile on +86 137 5230 3055.